MUGA Installation

On behalf of our client Sunshine Playgrounds, we were involved in the full installation of this large multi use games area.

The scope of this project was to provide a new MUGA for the children at the Grovelands School which was safe, clean and an up to date play solution.

We mobilised and levelled off the existing field and removed all spoil from site.

Temporary fencing was installed during these works to ensure the safety of the children whilst in the existing play area.

The tasks were to mark out the new area, install edgings and the framework of the MUGA which included basketball hoops and goal posts, sub base and type 1, terram the site and level off using granno dust ready for the artificial grass installation. 

We maintained the importance of a safe installation with clean and tidy work areas which was at the forefront due the the location.

Public safety was the priority, with the work site and access being kept clear and safe,  whilst showing consideration for children, parents and neighbouring residents.