Client

Network Rail Works Delivery

Surface Water Drainage | Sevington

We have just recently completed 375m of surface water drainage at the Sevington site we have been working on, on behalf of Network Rail.

375m of 300mm half perforated continuous drainage were installed between two lines. The team were required to dig under track in three different areas to install this and cross under the main haul road. This meant closure of the main haul road whilst works were carried out in this area, to reduce delays they created and maintained temporary access for Network Rail deliveries. 

Great work by our team at Sevington.